The ground floor timber frame is installed on Block 1
As this block is stepped by a whole story, the top of this lower timber frame reaches the height of the beam and block flooring on the level behind.
More timber frame will be arriving on site this week.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.