Friday, 14 June 2013

The substructure is now complete on Block 4 and the internal plot drainage has been run so the beam and block floor can be laid on top.
 
 
The top floor timber frame panels on Block 1 are being installed and the roof which has been constructed this week lifted on top. 
 
 