Friday, 21 June 2013

With the completion of the beam and block flooring on Block 4, the insulation and damp proof membrane is laid before the floor screed is poured. The first lift of the scaffold is also erected around the block in preparation for the timber frame.
 

 
 

Friday, 14 June 2013

The substructure is now complete on Block 4 and the internal plot drainage has been run so the beam and block floor can be laid on top.
 
 
The top floor timber frame panels on Block 1 are being installed and the roof which has been constructed this week lifted on top. 
 
 

Monday, 10 June 2013

At the back of Block 4 we can see the foundations are dug and concrete being poured while in the foreground the sub structure walls are being laid.
 
 

Monday, 3 June 2013

The ground floor timber frame is installed on Block 1
 


As this block is stepped by a whole story, the top of this lower timber frame reaches the height of the beam and block flooring on the level behind.
 

More timber frame will be arriving on site this week.