Tuesday, 7 May 2013

The Beam and Block flooring is installed on Block 1, the blocks help to evenly distribute the beams that support them, which span the substructure walls.

Timber frame is erected at Block 2 and the ply is begun on the roof ready for the installation of the Sarnafil membrane roof covering.


 Inside block 2 we can see the timber panels which arrive on site with rigid insulation already fitted which will ensure the homes will have excellent thermal performance.
 

Roof trusses are assembled on the substructure of Block 3 inside the scaffolding to save space on site, these will then be lifted onto the neighbouring plot.
 
 
 
 