Sections of the shuttering have been removed from the Block 4 retaining wall to reveal the concrete wall.
There was not enough space to safely work behind the wall on the next section so shuttering is only used on one side, the concrete pour is contained between this and the earth behind.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.