The crane is on site for the second day, lifting the beams in to place for the beam and block flooring on block 2 with block 3 completed earlier this week.
Wednesday, 13 March 2013
The deep drainage items are on site and being laid by the ground worker. Due to the size of the concrete rings, they have built in rungs for access during installation.
We are very careful on site with the safety measures taken to warn us of deep excavations.
Friday, 8 March 2013
Masonry works are progressing on Blocks 2 and 3.
Monday, 4 March 2013
The main attenuation drainage works have started and are progressing well.